I delegated plenty. Everything waited in line.

I delegate the building and fixing of internal business tools to AI agents, and I keep a log of it. Across 290 delegated tasks, the recorded failure rate for delegation calls was 7.2%, and only 0.7% had to be re-requested from scratch. (Figures from my own work log of 290 tasks delegated to AI tools; not an independent study.)

In those records, the main source of slowness was queueing. Only 2 of those 290 tasks had ever been delegated in parallel. Everything else waited in line: I waited for one unrelated task to finish before delegating the next. The slowness was not a prompting problem. It was a scheduling problem.

Two questions now decide, in advance, what may run at the same time:

  1. Do I need to see this task's result before I can even write the request for the other one? If yes, they run in sequence.
  2. Do both tasks rewrite the same files or the same tables? If yes, they run in sequence — or I split the work areas so they don't collide.

Read-only work — research, re-reading, checking — usually answers "no" to both, so it goes out in parallel. I aim for 3–5 tasks at a time; beyond that, the person reading the results (me) cannot keep up. Flows where each step consumes the previous result ("research → decide → build"), and the final adopt-or-reject judgment, stay sequential.

The same queue can form on the receiving side. I read results in a batch once they have all arrived. Reading and replying to each one as it lands just recreates the queue on the receiving side. And only failed tasks get re-requested — never the whole batch.

After adopting this rule, I revisited a later version of the log containing 328 tasks. In the 13 batches I examined, unrelated tasks could be delegated simultaneously in 10 (76.9%), and total waiting time dropped by about 26 minutes. (The 76.9% is a batch-unit rate — 10 of 13 batches — not a share of tasks. The 26 minutes is the cumulative saving across those batches, where each batch's saving is the sum of its tasks' durations minus the longest single duration: 1,560 seconds in total. The durations include a slight hook startup delay. These numbers are from my own environment and will vary with the work.)

So when things feel slow, I count the waiting time before I doubt the amount of delegation or the AI's quality. In those records, the bottleneck was the waiting between unrelated tasks. It was how much of it I made wait in line.

The two questions above are one part of a larger operation — the role split, the six-field request form, and the acceptance checks. The six fields are:

  1. Purpose — one line, rewritten for each task: what to fix or build, and when it happens.
  2. Scope — what may be touched, what is read-only, and a standing rule: anything not listed, ask before reading or changing it.
  3. Tasks — numbered, each with its own ruler for "done" (for example: "Done when the test that verifies it fails before the fix and passes after it").
  4. Must-not-do list — do not remove or skip tests to make them pass; do not rewrite or force-overwrite the change history; no passwords in screens, reports, or files; no production data in tests (use fictional data, like item code ABC-0001 or a customer named "Sample Store"); nothing outside the scope.
  5. May-decide / Must-ask — anything reversible, free, and not sent outside may be decided and logged; anything that costs money, is published outside, or is irreversible must be asked first.
  6. Report format — status (Done / Done, with concerns / Not enough information / Stopped), what was done with the verification command and its result attached, decisions, questions, and things noticed outside the scope. "Done" may only be written when the verification result is attached.

A filled-in start looks like this — Purpose: "Fix the bug in the ○○ tool where ○○ happens when ○○." Scope, may touch: "Only inside the ○○ tool's folder." Task 1: "Done when the test that verifies ○○ fails before the fix and passes after it."

What do you queue up that could run in parallel?

Drafted with AI assistance from my own playbook; all figures are from my own operating log.